7/29/10

Sheetmetal

I finally got the sheet metal up. I did it all myself. The ceiling pieces were quite difficult alone, especially the ones with cut outs where multiple things had to be lined up at once, then I had to hold the sheet in place with one hand while grabbing the screw gun with the other and trying to get a screw in the right place. There were some choice four letter words while doing the ceiling, which no child or lady should hear! But I got it done. I put in enough screws to hold them up, but I need to go back and finish adding screws. You can see on the left side some small pieces that need to be screwed up to fill the final open spot. Next will be to finish assembling the overhead door in the foreground, Installing and plumbing the heater, and then lights and electrical.